A growing picture,
not a census.
What the atlas currently includes, how its counts work and where research is still missing.
These are source-backed records, not a claim that every UK data centre has been found. Operating status follows the cited record and its checking date; it does not mean an independent inspection. Verification states currently include 0 verified and 101 corroborated records.
Buildings, sites and campuses
The database holds 101 distinct campus identities for these records. Where a source establishes one campus containing several buildings, those buildings do not automatically get separate markers. Possible aliases or shared sites without sufficient identity evidence remain research gaps. This is not a surveyed count of unique UK physical sites.
Why published national counts differ
The government’s investment-sector page describes more than 520 UK data centres, while Parliament’s March 2026 briefing describes around 450 large data centres. Commercial directories count listings, which may include individual buildings, planned facilities or different boundaries. These measures have different scope and dates; they are not a denominator for claiming this atlas’s completeness. Checked 18 November 2026.
Coverage by region
| Region | Project records | Operating |
|---|---|---|
| East Midlands | 3 | 2 |
| East of England | 10 | 7 |
| London | 25 | 14 |
| North East | 6 | 3 |
| North West | 5 | 4 |
| Northern Ireland | 2 | 0 |
| Scotland | 10 | 6 |
| South East | 18 | 13 |
| South West | 2 | 0 |
| Wales | 9 | 1 |
| West Midlands | 3 | 2 |
| Yorkshire and the Humber | 8 | 5 |
Function and association
Categories describe function or an evidenced company association, independently of development status. A colocation facility can be operating or proposed. Categories can overlap and must not be added together as a site total. Missing classification is left unresolved.
- AI computing campus: 2
- Enterprise or regional facility: 1
- Hyperscaler-associated: 1
- Other colocation: 43
- Proposed data-centre development: 43
Known operational gaps
Some major providers still have no explicitly recorded operator relationship in the operating inventory: Iomart, Brightsolid, Iron Mountain, BT, Ark Data Centres, nLighten, Microsoft, Amazon Web Services, Google. A provider missing here may appear as a hardware owner, developer, proposed project or other association elsewhere. Being represented does not mean its complete portfolio is covered.
Unresolved source permissions, stale ownership information, access failures and unclear campus identities are reasons to continue research. They are not evidence of wrongdoing or of no infrastructure. Private enterprise facilities and undisclosed hyperscaler locations are particularly incomplete. Northern Ireland is in scope; its operational inventory still needs careful current-operator checks.
Measuring discovery
The independent sample spans physical sites and developments across regions and stages, and is kept separate from discovery inputs. 15 of its 19 cases currently match public records. This is a small purposive sample, not an estimate of UK completeness or a representative operational-market recall percentage. A separate representative operational holdout has not yet been established.