Blantyre · Scotland

Asanti Hamilton/Glasgow

OperationalResearch updated 18 November 2026

Project overview

Asanti offers current colocation services at its named Hamilton location.[1]

At a glance

Current stage
Operational
Location
Blantyre

Reading the evidence

The current picture

What we know

Asanti offers current colocation services at its named Hamilton location.[1]

Asanti identifies Asanti Hamilton/Glasgow in its operating data-centre network.[2]

What is proposed

No specific forecast or commitment is summarised here. This does not establish that no plans exist.

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

Employment figures are not recorded in the published observations shown here.

See what has been researched ↓

A developing picture

This profile contains limited published evidence so far. The research coverage below distinguishes work not yet undertaken, access gaps and bounded searches without a finding. Missing information does not establish the absence of benefits or impacts.

Keeping track

What’s next?

We continue to check for changes to the site and any separate expansion plans. The sources shown here do not establish a confirmed next milestone.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 3 observations · 1 original sources

Project information

[1]campus operation

Asanti offers current colocation services at its named Hamilton location.

historic report · Observation date not established
Scope: Operator-reported operating service; checked 2026-11-18
Asanti · Official facility page

[2]operator report

Asanti identifies Asanti Hamilton/Glasgow in its operating data-centre network.

historic report · Observation date not established
Scope: Asanti Hamilton/Glasgow
Asanti · Official facility page

Site and buildings

[3]published location

The operator gives the location as 4 Lister Way, Hamilton International Technology Park, Blantyre. The map uses an approximate postcode area, not a surveyed building position.

historic report · Observation date not established
Scope: City/postcode location is approximate, not surveyed site coordinates; check identity before merging or adding a marker.
Asanti · Official facility page

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Asanti Hamilton data centre

Asanti · Publication date not established

Checked 18 November 2026 · factual-extraction

Factual extraction only, independently phrased site identifiers and operator technical facts. Reviewed published terms concern service/supply contracts; no express website mining prohibition observed. Original text and images remain copyrighted; no open text/image licence claimed or copied prose/images published.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Other colocation — Operator-reported facility function; City/postcode location is approximate, not surveyed site coordinates; check identity before merging or adding a marker. Source

Recorded company roles

  • Asanti · operator · corroborated Source

A chip owner or compute user is not automatically a site operator or tenant.

View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 424. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Power
No category-specific investigation has been recorded yet.
Water
No category-specific investigation has been recorded yet.
Employment
No category-specific investigation has been recorded yet.
Environment
No category-specific investigation has been recorded yet.
Community views and consultation
No category-specific investigation has been recorded yet.
History
No category-specific investigation has been recorded yet.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 18 November 2026 · 3 observations added; 3 replaced or withdrawn · version 424
  2. 18 November 2026 · First research version · version 360

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.

Other places nearby

Approximate locations do not establish shared ownership or infrastructure.

Aurelius data centre campus, North LanriggNorth Lanarkshire · AnnouncedDataVita DV1 campus, ChapelhallNorth Lanarkshire · OperationalDataVita DV2 GlasgowGlasgow · Operational