Project overview

The August 2026 assessment says DC01 and DC02 refer to two halves of the existing building. They are not separate campus markers.[11]

At a glance

Current stage
Operational
Location
North Lanarkshire

Reading the evidence

The current picture

What we know

The operator describes an 8,000 square metre facility, without defining this as gross floorspace or surveyed site area.[6]

What is proposed

The consultant describes additional rooftop chillers serving existing data halls.[12]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

Employment figures are not recorded in the published observations shown here.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Electricity and backup power

The operator lists N+N generator redundancy and dedicated fuel storage; fuel tank volume is not water demand.[2]

The technical table lists 24 MW available; the operator page does not establish this as measured operating IT power.[3]

Power figures can describe different things: electricity for computing equipment, the whole site or a grid connection. A proposed rating is not a measurement of electricity used.

Water and cooling

The operator identifies indirect adiabatic evaporative cooling. No annual or peak water consumption is quantified here.[8]

The consultant describes additional rooftop chillers serving existing data halls.[12]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

Environmental effects

DataVita attributes its green-power claim to Renewable Energy Guarantees of Origin rather than asserting all electricity is physically supplied by an on-site renewable source.[1]

The submitted acoustic assessment considers new rooftop ventilation/cooling equipment and ground-level generators.[10]

Keeping track

What’s next?

We continue to check for changes to the site and any separate expansion plans. The sources shown here do not establish a confirmed next milestone.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 12 observations · 3 original sources

Site and buildings

[6]facility area description

The operator describes an 8,000 square metre facility, without defining this as gross floorspace or surveyed site area.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / facility-area-description

Electricity and power

[2]backup generation

The operator lists N+N generator redundancy and dedicated fuel storage; fuel tank volume is not water demand.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / backup-generation

[3]published available power

The technical table lists 24 MW available; the operator page does not establish this as measured operating IT load.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / published-available-power

[4]published power discrepancy

The same operator page lists 40 MW in its overview and 24 MW under Power Available. These are retained as different published figures, not verified operational IT load.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / published-power-discrepancy

Water and cooling

[8]cooling technology

The operator identifies indirect adiabatic evaporative cooling. No annual or peak water consumption is quantified here.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / cooling-technology

Environmental assessments

[1]renewable attribute

DataVita attributes its green-power claim to Renewable Energy Guarantees of Origin rather than asserting all electricity is physically supplied by an on-site renewable source.

observed outcome · Observation date not established
Scope: DataVita DV1 campus, Chapelhall
DataVita · Project page / renewable-attribute

[10]noise assessment scope

The submitted acoustic assessment considers new rooftop ventilation/cooling equipment and ground-level generators.

consultant estimate · 6 August 2026
Scope: DataVita DV1 campus, Chapelhall
SEPA / applicant acoustic consultant · PDF page 3

Planning applications

[11]existing building scope

The August 2026 assessment says DC01 and DC02 refer to two halves of the existing building. They are not separate campus markers.

consultant estimate · 6 August 2026
Scope: DataVita DV1 campus, Chapelhall
SEPA / applicant acoustic consultant · PDF page 3

Development history

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Postcodes.io / ONS postcode area ML6 8HW

Postcodes.io; ONS/Ordnance Survey · Publication date not established

Checked 17 November 2026 · OGL-3.0

Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.

Reuse conditions ↗
DataVita DV1 Lanarkshire — official operator information

DataVita · Publication date not established

Checked 18 November 2026 · factual-extraction

No open copyright licence established. Facts-only extraction of individually stated operator/site/status/location facts; no prose, images, drawings or substantial database reproduction. Original rights retained. Final import must apply project factual-extraction rights policy.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Other colocation — Existing campus retained; current operator function checked in linked research. Source
Planning authority
North Lanarkshire
Original project source
SOURCE-3e66c0ee4cd92eca46
Location accuracy
Approximate postcode area ML6 8HW, not a surveyed building footprint. Source address: ML6 8HW
Record reuse licence
factual-extraction
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 413. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Power
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Water
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Employment
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 18 November 2026 · 8 observations added; 1 replaced or withdrawn · version 413
  2. 18 November 2026 · 1 observations added; 8 replaced or withdrawn · version 369
  3. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 266
  4. 17 November 2026 · 7 observations added; 0 replaced or withdrawn · version 246
  5. 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 184
  6. 17 November 2026 · First research version · version 183

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.

Other places nearby

Approximate locations do not establish shared ownership or infrastructure.

Asanti Hamilton/GlasgowBlantyre · OperationalAurelius data centre campus, North LanriggNorth Lanarkshire · AnnouncedCato data centre campus, AuchtertoolFife · Planning submitted