Back to the UK atlas

Fife · Scotland

Cato data centre campus, Auchtertool

Planning submittedResearch updated 17 November 2026

Project overview

ILI proposes an AI-focused data centre near Auchtertool in Fife.[5]

Who is behind it?

The source identifies ILI Group in the developer role for Cato data centre campus, Auchtertool.[1]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Planning submitted
Location
Fife

Reading the evidence

The current picture

What we know

The authority assessment states: The government case locates the campus north of Camilla Road at Gleniston, Auchtertool.[10]

What is proposed

ILI proposes an AI-focused data centre near Auchtertool in Fife.[5]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

Employment figures are not recorded in the published observations shown here.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Electricity and backup power

The authority assessment states: The application description includes electricity substations and associated infrastructure.[9]

Power figures can describe different things: electricity for computing equipment, the whole site or a grid connection. A proposed rating is not a measurement of electricity used.

Environmental effects

The applicant proposes: ILI lists native woodland and wetland creation as intended environmental features across the Stoics network.[3]

The applicant proposes: ILI lists community or industrial heat recovery among its intended network design features; no local heat customer is confirmed.[4]

Community views and consultation

The developer distinguishes pre-application feedback from formal representations to Fife Council.[2]

The applicant proposes: The original consultation advertised events on 22 April and 6 May 2025.[7]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 10 observations · 3 original sources

Project information

Companies and ownership

Site and buildings

Electricity and power

Environmental assessments

[3]network biodiversity intent

The applicant proposes: ILI lists native woodland and wetland creation as intended environmental features across the Stoics network.

applicant proposal · Observation date not established
Scope: Cato data centre campus, Auchtertool
ILI Group · Project page / network-biodiversity-intent

[4]network heat recovery intent

The applicant proposes: ILI lists community or industrial heat recovery among its intended network design features; no local heat customer is confirmed.

applicant proposal · Observation date not established
Scope: Cato data centre campus, Auchtertool
ILI Group · Project page / network-heat-recovery-intent

[8]eia required

The authority decision records: Scottish Ministers required an Environmental Impact Assessment on 17 August 2026. This is an assessment direction, not planning approval.

authority decision · 17 August 2026
Scope: Cato data centre campus, Auchtertool
Scottish Government DPEA · Project page / eia-required

Consultation and concerns

[2]representations scope

The developer distinguishes pre-application feedback from formal representations to Fife Council.

applicant proposal · Observation date not established
Scope: Cato data centre campus, Auchtertool
ILI Group · Project page / representations-scope

Planning applications

[6]application submitted

The developer reports submitting the Cato planning application to Fife Council, reference 26/01243/PPP.

applicant proposal · Observation date not established
Scope: Cato data centre campus, Auchtertool
ILI Group · Project page / application-submitted

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Postcodes.io / ONS postcode area KY2 5XW

Postcodes.io; ONS/Ordnance Survey · Publication date not established

Checked 17 November 2026 · OGL-3.0

Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Planning authority
Fife
Planning reference
26/01243/PPP
Location accuracy
Approximate postcode area KY2 5XW, not a surveyed building footprint. Source address: KY2 5XW
Record reuse licence
factual-extraction
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 271. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Water
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Employment
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 271
  2. 17 November 2026 · 4 observations added; 0 replaced or withdrawn · version 244
  3. 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 243
  4. 17 November 2026 · First research version · version 242

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.