Welwyn Garden City · East of England
Colt London North, Welwyn Garden City
Project overview
The authority decision records: The Environment Agency granted the original Colt Welwyn installation permit on 18 January 2019.[15]
At a glance
- Current stage
- Operational
- Location
- Welwyn Garden City
Reading the evidence
The current picture
What we know
The authority decision records: The Environment Agency granted the original Colt Welwyn installation permit on 18 January 2019.[15]
What is proposed
The applicant proposes: The sheet describes N+1 or N+N standby-generator resilience.[2]
The applicant proposes: Colt specifies 35 MW of IT power for London North.[3]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
Employment figures are not recorded in the published observations shown here.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
Keeping track
What’s next?
We continue to check for changes to the site and any separate expansion plans. The sources shown here do not establish a confirmed next milestone.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 16 observations · 3 original sources
Site and buildings
[7]location
The applicant proposes: The operator locates London North in Welwyn Garden City.
Colt Data Centre Services · Project profile / location[8]technical area
The applicant proposes: The published gross technical area is 21,339 square metres.
Colt Data Centre Services · PDF page 2Electricity and power
[2]generator resilience
The applicant proposes: The sheet describes N+1 or N+N standby-generator resilience.
Colt Data Centre Services · PDF page 3[3]it load
The applicant proposes: Colt specifies 35 MW of IT power for London North.
Colt Data Centre Services · PDF page 2[4]substation 1
The applicant proposes: Substation 1 is specified as 30 MVA at 132 kV; neither figure is IT load.
Colt Data Centre Services · PDF page 3[5]substation 2
The applicant proposes: Substation 2 is specified as 30 MVA at 132 kV.
Colt Data Centre Services · PDF page 3[6]substation 3
The applicant proposes: Substation 3 is specified as 8 MVA at 11 kV.
Colt Data Centre Services · PDF page 3[16]generator count
The decision recorded 60 generators present in January 2019, with further buildout planned; this is a dated baseline.
Environment Agency · PDF page 2Water and cooling
[9]cooling resilience
The applicant proposes: The sheet specifies N+2 and N+1 cooling-unit resilience.
Colt Data Centre Services · PDF page 3[10]free cooling
The applicant proposes: Colt says free cooling is used for most of the year; no numerical water demand is provided.
Colt Data Centre Services · PDF page 3Environmental assessments
[1]renewable energy
The applicant proposes: The operator says the facility uses renewable energy.
Colt Data Centre Services · Project profile / renewable-energy[13]air quality management plan
To address modelled short-term nitrogen-dioxide risks, the permit required an air-quality management plan with the local authority.
Environment Agency · PDF page 4[14]generator emissions measurement
The authority decision records: The regulator required measurement of actual generator emissions because manufacturer data may not represent reduced-load testing.
Environment Agency · PDF page 4Consultation and concerns
[11]county noise information
The county public-health response also requested more information about generator noise under individual testing regimes.
Environment Agency · PDF page 16[12]county public health concerns
The 2019 decision records Hertfordshire public-health concerns about local air quality and a request for actual monitoring data.
Environment Agency · PDF page 16Planning applications
[15]environmental permit
The authority decision records: The Environment Agency granted the original Colt Welwyn installation permit on 18 January 2019.
Environment Agency · PDF page 1Research limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Colt Data Centre Services
Checked 17 November 2026 · Original rights retained; factual summaries onlyColt Data Centre Services
Checked 17 November 2026 · Original rights retained; factual summaries onlyEnvironment Agency · 18 January 2019
Checked 17 November 2026 · Original rights retained; factual summaries onlyGeoNames · Publication date not established
Checked 17 November 2026 · CC-BY-4.0GeoNames CC BY 4.0; named locality representative point only.
Reuse conditions ↗Colt Data Centre Services · Publication date not established
Checked 17 November 2026 · factual-extractionIndependently written factual extraction from the cited original. Original copyright and reuse conditions retained; no licence to redistribute source prose, images or documents is asserted.
Reuse conditions ↗Record information, planning references and field-level evidence
- Planning authority
- Welwyn Hatfield
- Original project source
- SOURCE-e99c73789b9a62a155
- Location accuracy
- Approximate Welwyn Garden City locality centroid from GeoNames (2634552); not a facility footprint. Original source identifies Welwyn Garden City, Hertfordshire.
- Record reuse licence
- factual-extraction
View field-level evidence (13 claims)
- capacityConfidence — corroborated · original-b8659ea291c0b874325f94
- city — corroborated · geonames-2634552
- country — corroborated · original-b8659ea291c0b874325f94
- description — corroborated · original-b8659ea291c0b874325f94
- lastVerifiedAt — corroborated · original-b8659ea291c0b874325f94
- latitude — corroborated · geonames-2634552
- locationPrecision — corroborated · geonames-2634552
- longitude — corroborated · geonames-2634552
- name — corroborated · original-b8659ea291c0b874325f94
- region — corroborated · original-b8659ea291c0b874325f94
- status — corroborated · original-b8659ea291c0b874325f94
- type — corroborated · original-b8659ea291c0b874325f94
- verification — corroborated · original-b8659ea291c0b874325f94
Editorial rules uk-editorial-v2-public-trust-v1 · research version 329. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Water
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Employment
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 329
- 17 November 2026 · 8 observations added; 0 replaced or withdrawn · version 221
- 17 November 2026 · First research version · version 220
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.