Broomfield · East of England
Broomfield Hospital data centre
Project overview
The recorded proposal includes a secure compound providing acoustic screening.[1]
At a glance
- Current stage
- Planning submitted
- Location
- Broomfield
Reading the evidence
The current picture
What we know
The project’s recorded stage is planning submitted. See the original record and field-level evidence below.
What is proposed
No specific forecast or commitment is summarised here. This does not establish that no plans exist.
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
Employment figures are not recorded in the published observations shown here.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
A developing picture
This profile contains limited published evidence so far. The research coverage below distinguishes work not yet undertaken, access gaps and bounded searches without a finding. Missing information does not establish the absence of benefits or impacts.
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 4 observations · 1 original sources
Site and buildings
[2]associated works
The recorded proposal includes parking and access works.
Broomfield Parish Council · PDF page 1[3]proposal scope
The applicant proposes: The parish minutes describe a single-storey containerised data centre serving the hospital site; no hyperscale role is established.
Broomfield Parish Council · PDF page 1Environmental assessments
[1]acoustic screening
The recorded proposal includes a secure compound providing acoustic screening.
Broomfield Parish Council · PDF page 1Consultation and concerns
[4]parish response
Broomfield Parish Council recorded no comment on this application on 4 December 2024; this is not Chelmsford City Council planning approval.
Broomfield Parish Council · PDF page 1Research limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Broomfield Parish Council · 1 December 2024
Checked 17 November 2026 · Original rights retained; factual summaries onlyPostcodes.io; ONS/Ordnance Survey · Publication date not established
Checked 17 November 2026 · OGL-3.0Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.
Reuse conditions ↗Postcodes.io; ONS/Ordnance Survey · Publication date not established
Checked 17 November 2026 · OGL-3.0Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.
Reuse conditions ↗Broomfield Parish Council · Publication date not established
Checked 17 November 2026 · factual-extractionIndependently written facts from the cited original; original copyright retained. No permission to redistribute source text or images asserted.
Reuse conditions ↗PlanIndex · Publication date not established
Checked 17 November 2026 · CC-BY-4.0PlanIndex, https://planindex.co.uk/; whitespace normalised and classified by HyperscalerWatch; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
- Planning authority
- Chelmsford
- Planning reference
- 24/01176/FUL
- Location accuracy
- Approximate postcode area CM1 7ET, not a surveyed building footprint. Source address: CM1 7ET
- Record reuse licence
- CC-BY-4.0
View field-level evidence (13 claims)
- capacityConfidence — corroborated · planning-facts-013caa486741bd9a5fabb79c
- city — corroborated · onspd-ff0c75aba503e9dd0658664e-e304cd60
- country — corroborated · onspd-ff0c75aba503e9dd0658664e
- description — corroborated · planning-facts-013caa486741bd9a5fabb79c
- lastVerifiedAt — corroborated · original-8511c05a5eaeab541c37c4
- latitude — corroborated · onspd-ff0c75aba503e9dd0658664e-e304cd60
- locationPrecision — corroborated · onspd-ff0c75aba503e9dd0658664e-e304cd60
- longitude — corroborated · onspd-ff0c75aba503e9dd0658664e-e304cd60
- name — corroborated · planning-facts-013caa486741bd9a5fabb79c
- region — corroborated · onspd-ff0c75aba503e9dd0658664e
- status — corroborated · original-8511c05a5eaeab541c37c4
- type — corroborated · planning-facts-013caa486741bd9a5fabb79c
- verification — corroborated · planning-facts-013caa486741bd9a5fabb79c
Editorial rules uk-editorial-v2-public-trust-v1 · research version 339. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Water
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Employment
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- History
- Research was attempted, but source access or another evidence gap prevented completion. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 339
- 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 265
- 17 November 2026 · First research version · version 83
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.
Other places nearby
Approximate locations do not establish shared ownership or infrastructure.