Hillingdon · London

Former Sipson Garden Centre data centre

Planning submittedResearch updated 17 November 2026

Project overview

The current register records the outline application as undecided; it is not approved.[8]

Who is behind it?

The submitted economic statement identifies VIRTUS Data Centres as applicant.[1]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Planning submitted
Location
Hillingdon

Reading the evidence

The current picture

What we know

The current register records the outline application as undecided; it is not approved.[8]

What is proposed

The consultant estimates: Savills forecasts about £2.7 million of annual business rates, rather than reporting actual receipts.[3]

The consultant estimates: Savills estimates average gross on-site construction employment of 1,110 jobs per year across an assumed two-year build; this is not a permanent headcount.[4]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Jobs and investment

The consultant estimates: Savills forecasts about £2.7 million of annual business rates, rather than reporting actual receipts.[3]

The consultant estimates: Savills estimates average gross on-site construction employment of 1,110 jobs per year across an assumed two-year build; this is not a permanent headcount.[4]

Environmental effects

The register identifies this as an EIA development with a Regulation 19 notice.[7]

Community views and consultation

The register records neighbour consultation beginning on 4 November, with comments due 4 December 2026.[12]

What’s happened so far?

  1. The register records receipt on 20 October 2026.[10]

  2. The register records validation on 26 October 2026.[11]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 12 observations · 2 original sources

Companies and ownership

Site and buildings

Jobs and investment

[4]construction job estimate

The consultant estimates: Savills estimates average gross on-site construction employment of 1,110 jobs per year across an assumed two-year build; this is not a permanent headcount.

consultant estimate · Observation date not established
Scope: Former Sipson Garden Centre data centre
Savills Economics for VIRTUS via Hillingdon Council · PDF page 54

[5]local employment estimate

The assessment estimates 75 FTE net additional jobs in Hillingdon including on- and off-site effects; these are not all direct campus jobs.

consultant estimate · Observation date not established
Scope: Former Sipson Garden Centre data centre
Savills Economics for VIRTUS via Hillingdon Council · PDF page 55

Environmental assessments

Consultation and concerns

Planning applications

Development history

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Postcodes.io / ONS postcode area UB7 0HP

Postcodes.io; ONS/Ordnance Survey · Publication date not established

Checked 17 November 2026 · OGL-3.0

Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.

Reuse conditions ↗
sipson-economic

Savills Economics for VIRTUS via Hillingdon Council · Publication date not established

Checked 17 November 2026 · factual-extraction

Independently written facts from the cited original; original copyright retained. No permission to redistribute source text or images asserted.

Reuse conditions ↗
Planning record 67666/APP/2026/2416: Hillingdon

PlanIndex · Publication date not established

Checked 17 November 2026 · CC-BY-4.0

PlanIndex, https://planindex.co.uk/; whitespace normalised and classified by HyperscalerWatch; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source

Other source-reported milestones

Dates and stages are reported by the cited source. A forecast date does not establish that an event happened.

  • 26 October 2026 · Application 67666/APP/2026/2416; source date does not establish commencement. Source
Planning authority
Hillingdon
Planning reference
67666/APP/2026/2416
Location accuracy
Approximate postcode area UB7 0HP, not a surveyed building footprint. Source address: FORMER SIPSON GARDEN CENTRE SIPSON ROAD SIPSON UB7 0HP
Record reuse licence
CC-BY-4.0
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 338. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Water
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Employment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Environment
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Community views and consultation
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 5 observations added; 0 replaced or withdrawn · version 338
  2. 17 November 2026 · 7 observations added; 0 replaced or withdrawn · version 258
  3. 17 November 2026 · First research version · version 69

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.

Other places nearby

Approximate locations do not establish shared ownership or infrastructure.

Asanti FarnboroughFarnborough · OperationalAsanti ReadingReading · OperationalChandos Road data-centre development, Park RoyalLondon · Planning approved