Project overview
The current register records the outline application as undecided; it is not approved.[8]
Who is behind it?
The submitted economic statement identifies VIRTUS Data Centres as applicant.[1]
A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.
At a glance
- Current stage
- Planning submitted
- Location
- Hillingdon
Reading the evidence
The current picture
What we know
The current register records the outline application as undecided; it is not approved.[8]
What is proposed
The consultant estimates: Savills forecasts about £2.7 million of annual business rates, rather than reporting actual receipts.[3]
The consultant estimates: Savills estimates average gross on-site construction employment of 1,110 jobs per year across an assumed two-year build; this is not a permanent headcount.[4]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
What’s happened so far?
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 12 observations · 2 original sources
Companies and ownership
[1]applicant
The submitted economic statement identifies VIRTUS Data Centres as applicant.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 4[2]planning consultant
The applicant proposes: Savills Economics prepared the submitted needs and economic-benefits assessment.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 4Site and buildings
[9]hyperscale proposal
The submitted assessment describes the proposal as a hyperscale data-centre development.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 6Jobs and investment
[3]annual rates estimate
The consultant estimates: Savills forecasts about £2.7 million of annual business rates, rather than reporting actual receipts.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 59[4]construction job estimate
The consultant estimates: Savills estimates average gross on-site construction employment of 1,110 jobs per year across an assumed two-year build; this is not a permanent headcount.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 54[5]local employment estimate
The assessment estimates 75 FTE net additional jobs in Hillingdon including on- and off-site effects; these are not all direct campus jobs.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 55[6]operational job estimate
The consultant estimates: Savills forecasts 55 FTE direct on-site operational jobs, distinct from indirect and induced employment.
Savills Economics for VIRTUS via Hillingdon Council · PDF page 55Environmental assessments
[7]eia procedure
The register identifies this as an EIA development with a Regulation 19 notice.
London Borough of Hillingdon · Original register / eia-procedureConsultation and concerns
[12]neighbour consultation
The register records neighbour consultation beginning on 4 November, with comments due 4 December 2026.
London Borough of Hillingdon · Original register / neighbour-consultationPlanning applications
[8]register status
The current register records the outline application as undecided; it is not approved.
London Borough of Hillingdon · Original register / register-statusDevelopment history
[10]application received
The register records receipt on 20 October 2026.
London Borough of Hillingdon · Original register / application-received[11]application validated
The register records validation on 26 October 2026.
London Borough of Hillingdon · Original register / application-validatedResearch limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Savills Economics for VIRTUS via Hillingdon Council · 1 October 2026
Checked 17 November 2026 · Original rights retained; factual summaries onlyLondon Borough of Hillingdon
Checked 17 November 2026 · Original rights retained; factual summaries onlyPostcodes.io; ONS/Ordnance Survey · Publication date not established
Checked 17 November 2026 · OGL-3.0Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.
Reuse conditions ↗Savills Economics for VIRTUS via Hillingdon Council · Publication date not established
Checked 17 November 2026 · factual-extractionIndependently written facts from the cited original; original copyright retained. No permission to redistribute source text or images asserted.
Reuse conditions ↗PlanIndex · Publication date not established
Checked 17 November 2026 · CC-BY-4.0PlanIndex, https://planindex.co.uk/; whitespace normalised and classified by HyperscalerWatch; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Other source-reported milestones
Dates and stages are reported by the cited source. A forecast date does not establish that an event happened.
- 26 October 2026 · Application 67666/APP/2026/2416; source date does not establish commencement. Source
- Planning authority
- Hillingdon
- Planning reference
- 67666/APP/2026/2416
- Location accuracy
- Approximate postcode area UB7 0HP, not a surveyed building footprint. Source address: FORMER SIPSON GARDEN CENTRE SIPSON ROAD SIPSON UB7 0HP
- Record reuse licence
- CC-BY-4.0
View field-level evidence (13 claims)
- capacityConfidence — corroborated · planning-facts-86a64ef6b9646030b1efb7ee
- city — corroborated · onspd-203cafd838e67248e085c724
- country — corroborated · onspd-203cafd838e67248e085c724
- description — corroborated · planning-facts-86a64ef6b9646030b1efb7ee
- lastVerifiedAt — corroborated · original-cf320575fca30ec5b7355d
- latitude — corroborated · onspd-203cafd838e67248e085c724
- locationPrecision — corroborated · onspd-203cafd838e67248e085c724
- longitude — corroborated · onspd-203cafd838e67248e085c724
- name — corroborated · planning-facts-86a64ef6b9646030b1efb7ee
- region — corroborated · onspd-203cafd838e67248e085c724
- status — corroborated · original-cf320575fca30ec5b7355d
- type — corroborated · planning-facts-86a64ef6b9646030b1efb7ee
- verification — corroborated · planning-facts-86a64ef6b9646030b1efb7ee
Editorial rules uk-editorial-v2-public-trust-v1 · research version 338. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Water
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Employment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Environment
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Community views and consultation
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 5 observations added; 0 replaced or withdrawn · version 338
- 17 November 2026 · 7 observations added; 0 replaced or withdrawn · version 258
- 17 November 2026 · First research version · version 69
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.
Other places nearby
Approximate locations do not establish shared ownership or infrastructure.