Frogmore Industrial Estate data-centre development

Planning approvedResearch updated 17 November 2026

Project overview

The planning record identifies a substantive data-centre development at this site.[6]

Who is behind it?

The source identifies ReAssure Ltd in the applicant role for Frogmore Industrial Estate data-centre development.[1]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Planning approved
Location
London

Reading the evidence

The current picture

What we know

The planning record identifies a substantive data-centre development at this site.[6]

The authority's published register records this application as Approved. This records the application's status, not construction or operation.[7]

What is proposed

Kao proposes local skills and STEM pathways, without a quantified realised employment figure.[4]

The developer forecasts: Kao says it plans to retain ownership and operate the proposed facility; this does not mean it is operating now.[5]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Jobs and investment

Kao proposes local skills and STEM pathways, without a quantified realised employment figure.[4]

The earlier scheme required separate construction and operational local-labour and skills strategies.[19]

Electricity and backup power

Kao proposes backup-generator use during outages and brief daytime tests.[8]

The developer states a grid connection is confirmed; no numerical connection capacity is established by that statement.[9]

Power figures can describe different things: electricity for computing equipment, the whole site or a grid connection. A proposed rating is not a measurement of electricity used.

Water and cooling

The applicant proposes: Kao states annual water demand remains to be confirmed through detailed design.[16]

The current proposal uses closed-loop liquid cooling according to the developer.[17]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

Environmental effects

The earlier outline assessment sought operational noise below existing background levels.[21]

The earlier outline report sought a PUE target of 1.3 or justification if unavailable; this was not an operational measurement.[20]

Community views and consultation

The applicant proposes: Kao’s public consultation ran from 7 to 24 September 2026.[3]

The 2022 consultation included letters to Wesley Estate residents.[18]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 27 observations · 6 original sources

Project information

[5]future operation

The developer forecasts: Kao says it plans to retain ownership and operate the proposed facility; this does not mean it is operating now.

developer forecast · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: future-operation

Companies and ownership

[1]applicant

The source identifies ReAssure Ltd in the applicant role for Frogmore Industrial Estate data-centre development.

historic report · Observation date not established
Scope: Frogmore Industrial Estate data-centre development
OPDC · Original project/company role statement

Site and buildings

Electricity and power

[9]grid claim

The developer states a grid connection is confirmed; no numerical connection capacity is established by that statement.

applicant proposal · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: grid-claim

[11]new heat reuse

Kao proposes future heat-network readiness, conditional on a network becoming available.

applicant proposal · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: new-heat-reuse

Water and cooling

[16]demand not final

The applicant proposes: Kao states annual water demand remains to be confirmed through detailed design.

applicant proposal · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: demand-not-final

[26]earlier adiabatic option

The earlier outline allowed adiabatic cooling and diesel emergency generators; these options are distinct from Kao’s later proposals.

historic report · 7 July 2022
Scope: 21/0182/OUTOPDC
OPDC · Project article: earlier-adiabatic-option

[27]historic supply concern

Thames Water raised clean-water capacity concerns on the earlier outline; this is not automatically a current objection to Kao’s later design.

historic report · 7 July 2022
Scope: 21/0182/OUTOPDC
OPDC · PDF page 12

Jobs and investment

[4]new skills

Kao proposes local skills and STEM pathways, without a quantified realised employment figure.

applicant proposal · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: new-skills

Environmental assessments

[20]historic efficiency target

The earlier outline report sought a PUE target of 1.3 or justification if unavailable; this was not an operational measurement.

historic report · 7 July 2022
Scope: 21/0182/OUTOPDC
OPDC · PDF page 40

Consultation and concerns

Planning applications

Development history

[13]demolition programme

The applicant proposes: Kao’s programme reports demolition approval in July 2026; this does not establish approval of the new data-centre building.

applicant proposal · Observation date not established
Scope: 21/0182/OUTOPDC
Kao Data · Project article: demolition-programme

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Published application location

Greater London Authority / OPDC · Publication date not established

Checked 17 November 2026 · factual-extraction

Application location facts only; original document rights retained. Approximate application area, not a surveyed facility footprint.

Reuse conditions ↗
Planning London Datahub: 21/0182/OUTOPDC

Greater London Authority / OPDC · Publication date not established

Checked 17 November 2026 · factual-extraction

Independently written factual extraction from the cited original. Original copyright and reuse conditions retained; no licence to redistribute source prose, images or documents is asserted.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Planning authority
OPDC
Planning reference
21/0182/OUTOPDC
Location accuracy
Approximate application-area centroid published by the GLA; not a surveyed data-centre building footprint.
Record reuse licence
factual-extraction
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 343. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Water
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Employment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 343
  2. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 342
  3. 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 316
  4. 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 315
  5. 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 314
  6. 17 November 2026 · 8 observations added; 0 replaced or withdrawn · version 313
  7. 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 312
  8. 17 November 2026 · First research version · version 162

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.