Frogmore Industrial Estate data-centre development
Project overview
The planning record identifies a substantive data-centre development at this site.[6]
Who is behind it?
The source identifies ReAssure Ltd in the applicant role for Frogmore Industrial Estate data-centre development.[1]
A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.
At a glance
- Current stage
- Planning approved
- Location
- London
Reading the evidence
The current picture
What we know
The planning record identifies a substantive data-centre development at this site.[6]
The authority's published register records this application as Approved. This records the application's status, not construction or operation.[7]
What is proposed
Kao proposes local skills and STEM pathways, without a quantified realised employment figure.[4]
The developer forecasts: Kao says it plans to retain ownership and operate the proposed facility; this does not mean it is operating now.[5]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 27 observations · 6 original sources
Project information
[5]future operation
The developer forecasts: Kao says it plans to retain ownership and operate the proposed facility; this does not mean it is operating now.
Kao Data · Project article: future-operation[6]project description
The planning record identifies a substantive data-centre development at this site.
Greater London Authority / OPDC · JSON _source.descriptionCompanies and ownership
[1]applicant
The source identifies ReAssure Ltd in the applicant role for Frogmore Industrial Estate data-centre development.
OPDC · Original project/company role statement[2]developer
Kao Data is promoting the current proposal for the former Frogmore estate.
Kao Data · Project article: current-developerSite and buildings
[12]new community building
Kao’s new proposal includes a community building alongside the data centre.
Kao Data · Project article: new-community-building[23]existing buildings
The 2022 report describes four warehouse-style buildings containing seven industrial units.
OPDC · Project article: existing-buildings[24]historic site area
The earlier outline proposal concerned a 1.92-hectare Acton Lane site.
OPDC · Project article: historic-site-area[25]outline floor area
The earlier outline sought up to 35,000 square metres of data-centre floorspace.
OPDC · Project article: outline-floor-areaElectricity and power
[8]backup operation
Kao proposes backup-generator use during outages and brief daytime tests.
Kao Data · Project article: backup-operation[9]grid claim
The developer states a grid connection is confirmed; no numerical connection capacity is established by that statement.
Kao Data · Project article: grid-claim[10]hvo fuel
Kao proposes HVO generator fuel for the current scheme.
Kao Data · Project article: hvo-fuel[11]new heat reuse
Kao proposes future heat-network readiness, conditional on a network becoming available.
Kao Data · Project article: new-heat-reuse[22]historic heat obligation
The earlier obligations safeguarded future waste-heat supply, without establishing an operational network.
OPDC · Project article: historic-heat-obligationWater and cooling
[16]demand not final
The applicant proposes: Kao states annual water demand remains to be confirmed through detailed design.
Kao Data · Project article: demand-not-final[17]new closed loop
The current proposal uses closed-loop liquid cooling according to the developer.
Kao Data · Project article: new-closed-loop[26]earlier adiabatic option
The earlier outline allowed adiabatic cooling and diesel emergency generators; these options are distinct from Kao’s later proposals.
OPDC · Project article: earlier-adiabatic-option[27]historic supply concern
Thames Water raised clean-water capacity concerns on the earlier outline; this is not automatically a current objection to Kao’s later design.
OPDC · PDF page 12Jobs and investment
[4]new skills
Kao proposes local skills and STEM pathways, without a quantified realised employment figure.
Kao Data · Project article: new-skills[19]historic labour plan
The earlier scheme required separate construction and operational local-labour and skills strategies.
OPDC · Project article: historic-labour-planEnvironmental assessments
[20]historic efficiency target
The earlier outline report sought a PUE target of 1.3 or justification if unavailable; this was not an operational measurement.
OPDC · PDF page 40[21]operational noise condition
The earlier outline assessment sought operational noise below existing background levels.
OPDC · Project article: operational-noise-conditionConsultation and concerns
[3]consultation window
The applicant proposes: Kao’s public consultation ran from 7 to 24 September 2026.
Kao Data · Project article: consultation-window[18]neighbour consultation
The 2022 consultation included letters to Wesley Estate residents.
OPDC · Project article: neighbour-consultationPlanning applications
[7]register status
The authority's published register records this application as Approved. This records the application's status, not construction or operation.
Greater London Authority / OPDC · JSON _source.decision / statusDevelopment history
[13]demolition programme
The applicant proposes: Kao’s programme reports demolition approval in July 2026; this does not establish approval of the new data-centre building.
Kao Data · Project article: demolition-programme[14]main application programme
The developer programme anticipates a new main application in late autumn or winter 2026.
Kao Data · Project article: main-application-programme[15]register decision date
The register's decision-date field is 13/10/2022; this date alone does not resolve conflicting status fields.
Greater London Authority / OPDC · JSON _source.decision_dateResearch limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
OPDC · 7 July 2022
Checked 17 November 2026 · Original rights retained; factual summaries onlyKao Data
Checked 17 November 2026 · Original rights retained; factual summaries onlyKao Data
Checked 17 November 2026 · Original rights retained; factual summaries onlyGreater London Authority / OPDC
Checked 17 November 2026 · Original rights retained; factual summaries onlyKao Data
Checked 17 November 2026 · Original rights retained; factual summaries onlyOPDC · 7 July 2022
Checked 17 November 2026 · Original rights retained; factual summaries onlyGreater London Authority / OPDC · Publication date not established
Checked 17 November 2026 · factual-extractionApplication location facts only; original document rights retained. Approximate application area, not a surveyed facility footprint.
Reuse conditions ↗Greater London Authority / OPDC · Publication date not established
Checked 17 November 2026 · factual-extractionIndependently written factual extraction from the cited original. Original copyright and reuse conditions retained; no licence to redistribute source prose, images or documents is asserted.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
- Planning authority
- OPDC
- Planning reference
- 21/0182/OUTOPDC
- Location accuracy
- Approximate application-area centroid published by the GLA; not a surveyed data-centre building footprint.
- Record reuse licence
- factual-extraction
- Planning London Datahub: 21/0182/OUTOPDC ↗
- Related application 25/0083/NMAOPDC (amendment) ↗
- Related application 25/0177/AODOPDC (condition) ↗
- Related application 25/0179/REMOPDC (condition) ↗
View field-level evidence (13 claims)
- capacityConfidence — corroborated · original-445e8239ba5c52dd4a6474
- city — corroborated · location-62350db38c2b9f85dc67
- country — corroborated · original-445e8239ba5c52dd4a6474
- description — corroborated · original-445e8239ba5c52dd4a6474
- lastVerifiedAt — corroborated · original-445e8239ba5c52dd4a6474
- latitude — corroborated · location-62350db38c2b9f85dc67
- locationPrecision — corroborated · location-62350db38c2b9f85dc67
- longitude — corroborated · location-62350db38c2b9f85dc67
- name — corroborated · original-445e8239ba5c52dd4a6474
- region — corroborated · original-445e8239ba5c52dd4a6474
- status — corroborated · original-445e8239ba5c52dd4a6474
- type — corroborated · original-445e8239ba5c52dd4a6474
- verification — corroborated · original-445e8239ba5c52dd4a6474
Editorial rules uk-editorial-v2-public-trust-v1 · research version 343. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Water
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Employment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 343
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 342
- 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 316
- 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 315
- 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 314
- 17 November 2026 · 8 observations added; 0 replaced or withdrawn · version 313
- 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 312
- 17 November 2026 · First research version · version 162