London · London
Haslemere Heathrow Estate data-centre redevelopment
Project overview
The planning record identifies a substantive data-centre development at this site.[2]
Who is behind it?
The source identifies Kennedy Wilson in the applicant role for Haslemere Heathrow Estate data-centre redevelopment.[1]
A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.
At a glance
- Current stage
- Planning submitted
- Site area
- approximately 12.2 acres (4.94ha) in area. [24]
Reading the evidence
The current picture
What we know
The planning record identifies a substantive data-centre development at this site.[2]
The report describes approximately 12.2 acres or 4.94 hectares of existing industrial land.[24]
What is proposed
The consultant estimates: The work units are forecast to create 120 FTE jobs; the combined 210 is not entirely data-centre employment.[8]
The report estimates 90 permanent FTE jobs in the data-centre component, separate from the work units.[9]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 26 observations · 3 original sources
Project information
[2]project description
The planning record identifies a substantive data-centre development at this site.
Greater London Authority / Hounslow · JSON _source.description[13]applicant not operator
The officer report identifies Kennedy Wilson as applicant and expressly says it is not the data-centre operator and will not occupy the completed development.
Hounslow Council · PDF page 9[14]future operator selection
The report says the applicant intends to sell or lease the site to a specific future operator; none is confirmed by that statement.
Hounslow Council · PDF page 9Companies and ownership
[1]applicant
The source identifies Kennedy Wilson in the applicant role for Haslemere Heathrow Estate data-centre redevelopment.
Hounslow Council · Original project/company role statementSite and buildings
[21]data centre gea
The authority assessment states: The outline parameters allow up to 50,000 square metres GEA of data-centre use including ancillary spaces.
Hounslow Council · PDF page 1[22]reserved details
The authority assessment states: The applicant’s eventual operator or owner would need reserved-matters approvals within the outline development parameters.
Hounslow Council · PDF page 9[23]separate work units
The authority assessment states: Up to 4,150 square metres GEA of work units is a separate element of the redevelopment.
Hounslow Council · PDF page 1[24]site area
The report describes approximately 12.2 acres or 4.94 hectares of existing industrial land.
Hounslow Council · PDF page 2Electricity and power
[17]grid capacity
The utilities statement reports a new 80 MVA supply offer from NESO for the data centre, separate from an SSEN supply for the work units. MVA is not converted into IT MW.
Hounslow Council · PDF page 13[18]heat network opportunity
The report identifies potential export of waste heat to a future Hounslow district-heat network, subject to legal agreement and detailed design.
Hounslow Council · PDF page 2[19]pue condition
The authority assessment states: The recommended condition would require annualised PUE no greater than 1.3 at full occupancy; this is a future target, not measured performance.
Hounslow Council · PDF page 77[20]separate work unit supply
The work units would have a separate proposed SSEN supply subject to commercial agreement.
Hounslow Council · PDF page 13Water and cooling
[25]water efficiency reporting
The authority assessment states: A recommended condition requires reporting proposed Water Usage Effectiveness and intended best practice at detailed-design stage.
Hounslow Council · PDF page 77[26]water supply detail gap
The report leaves potable-water supplier engagement and infrastructure confirmation to reserved matters. A numerical water demand is not established by this statement.
Hounslow Council · PDF page 13Jobs and investment
[8]operational jobs
The consultant estimates: The work units are forecast to create 120 FTE jobs; the combined 210 is not entirely data-centre employment.
Hounslow Council · PDF page 29[9]operational jobs
The report estimates 90 permanent FTE jobs in the data-centre component, separate from the work units.
Hounslow Council · PDF page 29Environmental assessments
[10]air quality context
The report places the entire borough within an Air Quality Management Area, requiring development-specific mitigation.
Hounslow Council · PDF page 6[11]breeam design change
The authority assessment states: The submitted pre-assessments targeted Very Good; the recommended conditions require design toward Excellent at reserved matters.
Hounslow Council · PDF page 32[12]ground conditions
The officer report identifies industrial history and landfill as potential contamination risks needing control.
Hounslow Council · PDF page 6Consultation and concerns
[4]committee power and water concerns
The authority assessment states: The committee debate explicitly acknowledged high power and water demands while weighing jobs and infrastructure benefits. This records a councillor’s planning argument, not an impact measurement.
Hounslow Council · Project page: committee-power-and-water-concerns[5]electricity objection
The consultation report records one objection raising electricity capacity and usage concerns, distinct from the officer’s response and proposed power offer.
Hounslow Council · PDF page 13[6]neighbour notification
The council notified 450 neighbours and named local organisations in December 2025.
Hounslow Council · PDF page 12[7]river corridor comments
The Crane Valley Partnership offered observations on environmental and social benefits while explaining it holds no single collective position on whether the proposal should proceed.
Hounslow Council · PDF page 14Planning applications
[3]register status
The authority's published register records this application as Application Received. This records the application's status, not construction or operation.
Greater London Authority / Hounslow · JSON _source.decision / status[15]committee vote
The authority assessment states: The committee voted 13 in favour and one against, with no abstentions. A committee resolution is distinguished from the subsequent issued notice.
Hounslow Council · Project page: committee-vote[16]design response
The minutes record a change from a park proposal to work units in response to council feedback.
Hounslow Council · Project page: design-responseResearch limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Hounslow Council · 6 August 2026
Checked 17 November 2026 · Original rights retained; factual summaries onlyGreater London Authority / Hounslow
Checked 17 November 2026 · Original rights retained; factual summaries onlyHounslow Council · 6 August 2026
Checked 17 November 2026 · Original rights retained; factual summaries onlyGreater London Authority / Hounslow · Publication date not established
Checked 17 November 2026 · factual-extractionApplication location facts only; original document rights retained. Approximate application area, not a surveyed facility footprint.
Reuse conditions ↗Greater London Authority / Hounslow · Publication date not established
Checked 17 November 2026 · factual-extractionIndependently written factual extraction from the cited original. Original copyright and reuse conditions retained; no licence to redistribute source prose, images or documents is asserted.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
- Planning authority
- Hounslow
- Planning reference
- P/2025/3669
- Location accuracy
- Approximate application-area centroid published by the GLA; not a surveyed data-centre building footprint.
- Record reuse licence
- factual-extraction
View field-level evidence (13 claims)
- capacityConfidence — corroborated · original-2e244d91aa88984d418eae
- city — corroborated · location-97262fded029371683db
- country — corroborated · original-2e244d91aa88984d418eae
- description — corroborated · original-2e244d91aa88984d418eae
- lastVerifiedAt — corroborated · original-2e244d91aa88984d418eae
- latitude — corroborated · location-97262fded029371683db
- locationPrecision — corroborated · location-97262fded029371683db
- longitude — corroborated · location-97262fded029371683db
- name — corroborated · original-2e244d91aa88984d418eae
- region — corroborated · original-2e244d91aa88984d418eae
- status — corroborated · original-2e244d91aa88984d418eae
- type — corroborated · original-2e244d91aa88984d418eae
- verification — corroborated · original-2e244d91aa88984d418eae
Editorial rules uk-editorial-v2-public-trust-v1 · research version 326. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Water
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Employment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 5 observations added; 4 replaced or withdrawn · version 326
- 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 304
- 17 November 2026 · 20 observations added; 0 replaced or withdrawn · version 303
- 17 November 2026 · First research version · version 165
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.