Back to the UK atlas

London · London

Haslemere Heathrow Estate data-centre redevelopment

Planning submittedResearch updated 17 November 2026

Project overview

The planning record identifies a substantive data-centre development at this site.[2]

Who is behind it?

The source identifies Kennedy Wilson in the applicant role for Haslemere Heathrow Estate data-centre redevelopment.[1]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Planning submitted
Site area
approximately 12.2 acres (4.94ha) in area. [24]

Reading the evidence

The current picture

What we know

The planning record identifies a substantive data-centre development at this site.[2]

The report describes approximately 12.2 acres or 4.94 hectares of existing industrial land.[24]

What is proposed

The consultant estimates: The work units are forecast to create 120 FTE jobs; the combined 210 is not entirely data-centre employment.[8]

The report estimates 90 permanent FTE jobs in the data-centre component, separate from the work units.[9]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Jobs and investment

The consultant estimates: The work units are forecast to create 120 full-time equivalent jobs; the combined 210 is not entirely data-centre employment.[8]

The report estimates 90 permanent full-time equivalent jobs in the data-centre component, separate from the work units.[9]

Electricity and backup power

The utilities statement reports a new 80 MVA supply offer from NESO for the data centre, separate from an SSEN supply for the work units. MVA is not converted into IT MW.[17]

The report identifies potential export of waste heat to a future Hounslow district-heat network, subject to legal agreement and detailed design.[18]

Power figures can describe different things: electricity for computing equipment, the whole site or a grid connection. A proposed rating is not a measurement of electricity used.

Water and cooling

The authority assessment states: A recommended condition requires reporting proposed Water Usage Effectiveness and intended best practice at detailed-design stage.[25]

The report leaves potable-water supplier engagement and infrastructure confirmation to reserved matters. A numerical water demand is not established by this statement.[26]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

Environmental effects

The report places the entire borough within an Air Quality Management Area, requiring development-specific mitigation.[10]

The authority assessment states: The submitted pre-assessments targeted Very Good; the recommended conditions require design toward Excellent at reserved matters.[11]

Community views and consultation

The consultation report records one objection raising electricity capacity and usage concerns, distinct from the officer’s response and proposed power offer.[5]

The authority assessment states: The committee debate explicitly acknowledged high power and water demands while weighing jobs and infrastructure benefits. This records a councillor’s planning argument, not an impact measurement.[4]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 26 observations · 3 original sources

Project information

[13]applicant not operator

The officer report identifies Kennedy Wilson as applicant and expressly says it is not the data-centre operator and will not occupy the completed development.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 9

[14]future operator selection

The report says the applicant intends to sell or lease the site to a specific future operator; none is confirmed by that statement.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 9

Companies and ownership

Site and buildings

[21]data centre gea

The authority assessment states: The outline parameters allow up to 50,000 square metres GEA of data-centre use including ancillary spaces.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 1

[22]reserved details

The authority assessment states: The applicant’s eventual operator or owner would need reserved-matters approvals within the outline development parameters.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 9

[23]separate work units

The authority assessment states: Up to 4,150 square metres GEA of work units is a separate element of the redevelopment.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 1

[24]site area

The report describes approximately 12.2 acres or 4.94 hectares of existing industrial land.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 2

Electricity and power

[17]grid capacity

The utilities statement reports a new 80 MVA supply offer from NESO for the data centre, separate from an SSEN supply for the work units. MVA is not converted into IT MW.

applicant proposal · 6 August 2026
Scope: Proposed data-centre electricity-supply offer; not operating IT load
Hounslow Council · PDF page 13

[18]heat network opportunity

The report identifies potential export of waste heat to a future Hounslow district-heat network, subject to legal agreement and detailed design.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 2

[19]pue condition

The authority assessment states: The recommended condition would require annualised PUE no greater than 1.3 at full occupancy; this is a future target, not measured performance.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 77

[20]separate work unit supply

The work units would have a separate proposed SSEN supply subject to commercial agreement.

applicant proposal · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 13

Water and cooling

[25]water efficiency reporting

The authority assessment states: A recommended condition requires reporting proposed Water Usage Effectiveness and intended best practice at detailed-design stage.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 77

[26]water supply detail gap

The report leaves potable-water supplier engagement and infrastructure confirmation to reserved matters. A numerical water demand is not established by this statement.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 13

Jobs and investment

[8]operational jobs

The consultant estimates: The work units are forecast to create 120 FTE jobs; the combined 210 is not entirely data-centre employment.

consultant estimate · 6 August 2026
Scope: Forecast work-unit permanent employment; not data-centre staff
Hounslow Council · PDF page 29

[9]operational jobs

The report estimates 90 permanent FTE jobs in the data-centre component, separate from the work units.

consultant estimate · 6 August 2026
Scope: Forecast data-centre permanent employment
Hounslow Council · PDF page 29

Environmental assessments

[10]air quality context

The report places the entire borough within an Air Quality Management Area, requiring development-specific mitigation.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 6

[11]breeam design change

The authority assessment states: The submitted pre-assessments targeted Very Good; the recommended conditions require design toward Excellent at reserved matters.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 32

[12]ground conditions

The officer report identifies industrial history and landfill as potential contamination risks needing control.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 6

Consultation and concerns

[4]committee power and water concerns

The authority assessment states: The committee debate explicitly acknowledged high power and water demands while weighing jobs and infrastructure benefits. This records a councillor’s planning argument, not an impact measurement.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · Project page: committee-power-and-water-concerns

[5]electricity objection

The consultation report records one objection raising electricity capacity and usage concerns, distinct from the officer’s response and proposed power offer.

public objection · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 13

[6]neighbour notification

The council notified 450 neighbours and named local organisations in December 2025.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 12

[7]river corridor comments

The Crane Valley Partnership offered observations on environmental and social benefits while explaining it holds no single collective position on whether the proposal should proceed.

statutory response · 6 August 2026
Scope: P/2025/3669
Hounslow Council · PDF page 14

Planning applications

[15]committee vote

The authority assessment states: The committee voted 13 in favour and one against, with no abstentions. A committee resolution is distinguished from the subsequent issued notice.

authority finding · 6 August 2026
Scope: P/2025/3669
Hounslow Council · Project page: committee-vote

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Published application location

Greater London Authority / Hounslow · Publication date not established

Checked 17 November 2026 · factual-extraction

Application location facts only; original document rights retained. Approximate application area, not a surveyed facility footprint.

Reuse conditions ↗
Planning London Datahub: P/2025/3669

Greater London Authority / Hounslow · Publication date not established

Checked 17 November 2026 · factual-extraction

Independently written factual extraction from the cited original. Original copyright and reuse conditions retained; no licence to redistribute source prose, images or documents is asserted.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Planning authority
Hounslow
Planning reference
P/2025/3669
Location accuracy
Approximate application-area centroid published by the GLA; not a surveyed data-centre building footprint.
Record reuse licence
factual-extraction
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 326. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Water
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Employment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 5 observations added; 4 replaced or withdrawn · version 326
  2. 17 November 2026 · 3 observations added; 0 replaced or withdrawn · version 304
  3. 17 November 2026 · 20 observations added; 0 replaced or withdrawn · version 303
  4. 17 November 2026 · First research version · version 165

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.