City of Durham · North East

Aykley Heads Plot D data centre

AnnouncedResearch updated 17 November 2026

Project overview

The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.[20]

Who is behind it?

Durham County Council is applicant on the related variation report. Application-specific role; not an operator or the RM applicant.[3]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Announced
Buildings in the proposal
1 buildings[28]

Reading the evidence

The current picture

What we know

The officer retained the drainage condition because new details had not yet been assessed. Committee position, not a claim that condition remains undischarged now.[21]

The report records no further EIA requirement for the Plot D reserved-matters screening. The wider hybrid development had an Environmental Statement; not an assertion of no environmental assessment.[22]

What is proposed

The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.[20]

Generators and transformers are proposed in a compound south of the main data hall. No generator count or rating was established.[26]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

Employment figures are not recorded in the published observations shown here.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Electricity and backup power

Generators and transformers are proposed in a compound south of the main data hall. No generator count or rating was established.[26]

The applicant proposes: The officer assessment describes two electric substations along the eastern site boundary. Count does not establish connection capacity, IT power or operational consumption.[27]

Power figures can describe different things: electricity for computing equipment, the whole site or a grid connection. A proposed rating is not a measurement of electricity used.

Water and cooling

The applicant describes rear-door heat exchangers for the proposed data halls. Does not establish water demand or measured water use.[37]

External heat-rejection equipment is proposed behind rooftop louvres.[38]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

Environmental effects

The applicant proposed biodiversity credits including 0.2 hectares of urban trees for canopy-loss compensation. Off-site compensation proposal, not site area or observed planting.[13]

The report places the site in Flood Zone 1 for river flooding. Does not establish absence of surface-water risk.[16]

Community views and consultation

The RM report records four objection letters, including parish and trust comments. January 2025 report snapshot for RM only; do not add the variation count or treat as current total.[9]

A public objection states: Recorded objections raise habitat/tree loss, noise and air emissions, parking, design and employment density. Recorded concerns, not established findings of pollution or harm.[8]

A supporting public representation states: At committee the parish expressed application support while retaining design, jobs and heat-reuse concerns. Earlier correspondence was logged as objection; preserve both dates and positions.[11]

What’s happened so far?

  1. The two Plot D applications were resolved at the 10 January 2025 committee meeting. Meeting date, not an issued-decision date.[36]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 38 observations · 4 original sources

Project information

[20]research purpose

The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 16

Companies and ownership

[3]applicant

Durham County Council is applicant on the related variation report. Application-specific role; not an operator or the RM applicant.

authority finding · 10 January 2025
Scope: DM/24/02829/VOC
Durham County Council · PDF page 1

[5]engineering consultant

The report identifies NSL as the plant-noise assessment author. Document authorship only, not operation or ownership.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 25

[6]engineering consultant

The authority assessment states: The listed drainage strategy was prepared by CSEA. Document authorship only, not operation or ownership.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 25

[7]engineering consultant

The report lists RPS as the air-quality assessment author. Document authorship only, not operation or ownership.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 25

Site and buildings

[29]building external floor area

The applicant describes increasing the permitted Plot D gross external area to 3,845 square metres. Building gross external area, not gross internal area or campus land area.

applicant proposal · 10 January 2025
Scope: DM/24/02829/VOC
Durham County Council · PDF page 19

[30]building gantry height

The applicant proposes: The described height including the gantry is 9.5 metres.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

[31]building louvre height

The applicant proposes: Rooftop louvres would take the height to 13 metres.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

[33]car parking count

The applicant proposes: The submitted layout includes 17 car parking bays.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 20

[35]maximum flue height

The applicant proposes: Flues above the rooftop plant would reach 15 metres above ground.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

Electricity and power

[26]generator layout

Generators and transformers are proposed in a compound south of the main data hall. No generator count or rating was established.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

[27]substation count

The applicant proposes: The officer assessment describes two electric substations along the eastern site boundary. Count does not establish connection capacity, IT load or operational consumption.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 19

Water and cooling

[37]cooling technology

The applicant describes rear-door heat exchangers for the proposed data halls. Does not establish water demand or measured water use.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 16

[38]rooftop heat rejection

External heat-rejection equipment is proposed behind rooftop louvres.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

Environmental assessments

[12]authority planning balance

Officers considered the benefits to outweigh the tree-cover impacts and recommended approval. Officer planning balance, not a claim of no environmental impacts.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 24

[13]biodiversity compensation

The applicant proposed biodiversity credits including 0.2 hectares of urban trees for canopy-loss compensation. Off-site compensation proposal, not site area or observed planting.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 21

[14]breeam target

The applicant proposes: The sustainability assessment targets at least BREEAM Very Good. Design target, not awarded certification.

applicant proposal · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 23

[15]district heat strategy condition

The recommended conditions require an off-site heat-network strategy before development beyond specified preparatory works. Committee-report recommendation; no issued notice retrieved.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 27

[16]fluvial flood zone

The report places the site in Flood Zone 1 for river flooding. Does not establish absence of surface-water risk.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 2

[17]future heat network capability

The report says the equipment could connect to a district-heating system if one is built. Capability is not evidence of an existing network or operating heat reuse.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 22

[18]suds assessment

Officers considered amended SuDS and permeable paving acceptable in principle, with technical details still required. Drainage assessment, not cooling-water demand or measured performance.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 20

[19]tree loss assessment

The report recognises tree losses that cannot be fully mitigated within the site. Officers assessed overall planning acceptability separately.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 15

Consultation and concerns

[8]community concerns

A public objection states: Recorded objections raise habitat/tree loss, noise and air emissions, parking, design and employment density. Recorded concerns, not established findings of pollution or harm.

public objection · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 16

[9]objection count

The RM report records four objection letters, including parish and trust comments. January 2025 report snapshot for RM only; do not add the variation count or treat as current total.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 15

[10]parish employment concern

A public objection states: The parish compared reported 7 to 15 jobs with an earlier expectation of 200 to 300 on Plot D. Parish consultation comparison, not a verified project forecast or observed jobs.

public objection · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 13

[11]parish principle support

A supporting public representation states: At committee the parish expressed application support while retaining design, jobs and heat-reuse concerns. Earlier correspondence was logged as objection; preserve both dates and positions.

public support · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 10

Planning applications

[21]drainage condition update

The officer retained the drainage condition because new details had not yet been assessed. Committee position, not a claim that condition remains undischarged now.

authority decision · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 7

[22]eia screening

The report records no further EIA requirement for the Plot D reserved-matters screening. The wider hybrid development had an Environmental Statement; not an assertion of no environmental assessment.

authority finding · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 4

[23]reserved matters resolution

On 10 January 2025 committee resolved to approve the RM application subject to conditions and reported amendments. Committee resolution, not a retrieved issued decision notice or construction start.

authority decision · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 13

[24]tree condition update

The authority decision records: At committee updated tree-protection documents were accepted and proposed condition 7 was removed. Do not display the report original condition 7 as unchanged after committee.

authority decision · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 7

[25]variation resolution

The authority decision records: The same meeting resolved to approve the related variation subject to reported conditions. Related application, not a separate campus.

authority decision · 10 January 2025
Scope: DM/24/02829/VOC
Durham County Council · PDF page 13

Development history

[1]outline history

The report records approval of the wider hybrid permission in January 2021. Wider permission; no exact day or completed data-centre building inferred.

historic report · Observation date not established
Scope: DM/24/02888/RM
Durham County Council · PDF page 3

[36]committee date

The two Plot D applications were resolved at the 10 January 2025 committee meeting. Meeting date, not an issued-decision date.

authority decision · 10 January 2025
Scope: DM/24/02888/RM
Durham County Council · PDF page 13

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Postcodes.io / ONS postcode area DH1 5UQ

Postcodes.io; ONS/Ordnance Survey · Publication date not established

Checked 17 November 2026 · OGL-3.0

Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.

Reuse conditions ↗
Planning record DM/24/02888/RM: County Durham

PlanIndex · Publication date not established

Checked 17 November 2026 · CC-BY-4.0

PlanIndex, https://planindex.co.uk/; whitespace normalised and classified by HyperscalerWatch; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source

Other source-reported milestones

Dates and stages are reported by the cited source. A forecast date does not establish that an event happened.

  • 23 October 2024 · Application DM/24/02888/RM; source date does not establish commencement. Source
Planning authority
County Durham
Planning reference
DM/24/02888/RM
Location accuracy
Approximate postcode area DH1 5UQ, not a surveyed building footprint. Source address: Plot D Land At Aykley Heads Framwelgate Peth Durham DH1 5UQ
Record reuse licence
CC-BY-4.0
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 150. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Water
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Employment
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 1 observations added; 1 replaced or withdrawn · version 150
  2. 17 November 2026 · 6 observations added; 6 replaced or withdrawn · version 149
  3. 17 November 2026 · 29 observations added; 29 replaced or withdrawn · version 148
  4. 17 November 2026 · 2 observations added; 2 replaced or withdrawn · version 147
  5. 17 November 2026 · 0 observations added; 0 replaced or withdrawn · version 125
  6. 17 November 2026 · 0 observations added; 0 replaced or withdrawn · version 123
  7. 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 117
  8. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 114
  9. 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 113
  10. 17 November 2026 · 23 observations added; 0 replaced or withdrawn · version 112
  11. 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 111
  12. 17 November 2026 · First research version · version 86

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.