City of Durham · North East
Aykley Heads Plot D data centre
Project overview
The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.[20]
Who is behind it?
Durham County Council is applicant on the related variation report. Application-specific role; not an operator or the RM applicant.[3]
A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.
At a glance
- Current stage
- Announced
- Buildings in the proposal
- 1 buildings[28]
Reading the evidence
The current picture
What we know
The officer retained the drainage condition because new details had not yet been assessed. Committee position, not a claim that condition remains undischarged now.[21]
The report records no further EIA requirement for the Plot D reserved-matters screening. The wider hybrid development had an Environmental Statement; not an assertion of no environmental assessment.[22]
What is proposed
The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.[20]
Generators and transformers are proposed in a compound south of the main data hall. No generator count or rating was established.[26]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
Employment figures are not recorded in the published observations shown here.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
What’s happened so far?
The two Plot D applications were resolved at the 10 January 2025 committee meeting. Meeting date, not an issued-decision date.[36]
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 38 observations · 4 original sources
Project information
[20]research purpose
The applicant describes research-focused data halls supporting Durham University advanced computing. Intended use, not evidence of current operation or hyperscaler tenancy.
Durham County Council · PDF page 16Companies and ownership
[2]planning consultant
Business Durham identifies DPP as the planning adviser.
Business Durham, Durham County Council · Article body[3]applicant
Durham County Council is applicant on the related variation report. Application-specific role; not an operator or the RM applicant.
Durham County Council · PDF page 1[4]applicant
The reserved-matters report names Durham University as applicant.
Durham County Council · PDF page 1[5]engineering consultant
The report identifies NSL as the plant-noise assessment author. Document authorship only, not operation or ownership.
Durham County Council · PDF page 25[6]engineering consultant
The authority assessment states: The listed drainage strategy was prepared by CSEA. Document authorship only, not operation or ownership.
Durham County Council · PDF page 25[7]engineering consultant
The report lists RPS as the air-quality assessment author. Document authorship only, not operation or ownership.
Durham County Council · PDF page 25Site and buildings
[28]building count
The proposal comprises one data-centre building.
Durham County Council · PDF page 2[29]building external floor area
The applicant describes increasing the permitted Plot D gross external area to 3,845 square metres. Building gross external area, not gross internal area or campus land area.
Durham County Council · PDF page 19[30]building gantry height
The applicant proposes: The described height including the gantry is 9.5 metres.
Durham County Council · PDF page 3[31]building louvre height
The applicant proposes: Rooftop louvres would take the height to 13 metres.
Durham County Council · PDF page 3[32]building main height
The proposed main building is described as 6.5 metres high.
Durham County Council · PDF page 3[33]car parking count
The applicant proposes: The submitted layout includes 17 car parking bays.
Durham County Council · PDF page 20[34]cycle parking count
The proposal includes 12 enclosed cycle-parking spaces.
Durham County Council · PDF page 20[35]maximum flue height
The applicant proposes: Flues above the rooftop plant would reach 15 metres above ground.
Durham County Council · PDF page 3Electricity and power
[26]generator layout
Generators and transformers are proposed in a compound south of the main data hall. No generator count or rating was established.
Durham County Council · PDF page 3[27]substation count
The applicant proposes: The officer assessment describes two electric substations along the eastern site boundary. Count does not establish connection capacity, IT load or operational consumption.
Durham County Council · PDF page 19Water and cooling
[37]cooling technology
The applicant describes rear-door heat exchangers for the proposed data halls. Does not establish water demand or measured water use.
Durham County Council · PDF page 16[38]rooftop heat rejection
External heat-rejection equipment is proposed behind rooftop louvres.
Durham County Council · PDF page 3Environmental assessments
[12]authority planning balance
Officers considered the benefits to outweigh the tree-cover impacts and recommended approval. Officer planning balance, not a claim of no environmental impacts.
Durham County Council · PDF page 24[13]biodiversity compensation
The applicant proposed biodiversity credits including 0.2 hectares of urban trees for canopy-loss compensation. Off-site compensation proposal, not site area or observed planting.
Durham County Council · PDF page 21[14]breeam target
The applicant proposes: The sustainability assessment targets at least BREEAM Very Good. Design target, not awarded certification.
Durham County Council · PDF page 23[15]district heat strategy condition
The recommended conditions require an off-site heat-network strategy before development beyond specified preparatory works. Committee-report recommendation; no issued notice retrieved.
Durham County Council · PDF page 27[16]fluvial flood zone
The report places the site in Flood Zone 1 for river flooding. Does not establish absence of surface-water risk.
Durham County Council · PDF page 2[17]future heat network capability
The report says the equipment could connect to a district-heating system if one is built. Capability is not evidence of an existing network or operating heat reuse.
Durham County Council · PDF page 22[18]suds assessment
Officers considered amended SuDS and permeable paving acceptable in principle, with technical details still required. Drainage assessment, not cooling-water demand or measured performance.
Durham County Council · PDF page 20[19]tree loss assessment
The report recognises tree losses that cannot be fully mitigated within the site. Officers assessed overall planning acceptability separately.
Durham County Council · PDF page 15Consultation and concerns
[8]community concerns
A public objection states: Recorded objections raise habitat/tree loss, noise and air emissions, parking, design and employment density. Recorded concerns, not established findings of pollution or harm.
Durham County Council · PDF page 16[9]objection count
The RM report records four objection letters, including parish and trust comments. January 2025 report snapshot for RM only; do not add the variation count or treat as current total.
Durham County Council · PDF page 15[10]parish employment concern
A public objection states: The parish compared reported 7 to 15 jobs with an earlier expectation of 200 to 300 on Plot D. Parish consultation comparison, not a verified project forecast or observed jobs.
Durham County Council · PDF page 13[11]parish principle support
A supporting public representation states: At committee the parish expressed application support while retaining design, jobs and heat-reuse concerns. Earlier correspondence was logged as objection; preserve both dates and positions.
Durham County Council · PDF page 10Planning applications
[21]drainage condition update
The officer retained the drainage condition because new details had not yet been assessed. Committee position, not a claim that condition remains undischarged now.
Durham County Council · PDF page 7[22]eia screening
The report records no further EIA requirement for the Plot D reserved-matters screening. The wider hybrid development had an Environmental Statement; not an assertion of no environmental assessment.
Durham County Council · PDF page 4[23]reserved matters resolution
On 10 January 2025 committee resolved to approve the RM application subject to conditions and reported amendments. Committee resolution, not a retrieved issued decision notice or construction start.
Durham County Council · PDF page 13[24]tree condition update
The authority decision records: At committee updated tree-protection documents were accepted and proposed condition 7 was removed. Do not display the report original condition 7 as unchanged after committee.
Durham County Council · PDF page 7[25]variation resolution
The authority decision records: The same meeting resolved to approve the related variation subject to reported conditions. Related application, not a separate campus.
Durham County Council · PDF page 13Development history
[1]outline history
The report records approval of the wider hybrid permission in January 2021. Wider permission; no exact day or completed data-centre building inferred.
Durham County Council · PDF page 3[36]committee date
The two Plot D applications were resolved at the 10 January 2025 committee meeting. Meeting date, not an issued-decision date.
Durham County Council · PDF page 13Research limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Durham County Council · 10 January 2025
Checked 17 November 2026 · Original rights retained; factual summaries onlyBusiness Durham, Durham County Council · 4 November 2024
Checked 17 November 2026 · Original rights retained; factual summaries onlyDurham County Council · 10 January 2025
Checked 17 November 2026 · Original rights retained; factual summaries onlyDurham County Council · 10 January 2025
Checked 17 November 2026 · Original rights retained; factual summaries onlyPostcodes.io; ONS/Ordnance Survey · Publication date not established
Checked 17 November 2026 · OGL-3.0Contains Ordnance Survey data © Crown copyright and database right; Royal Mail data © Royal Mail copyright and database right; National Statistics data © Crown copyright and database right. Great Britain postcode centroid, accessed through Postcodes.io; not a facility position.
Reuse conditions ↗PlanIndex · Publication date not established
Checked 17 November 2026 · CC-BY-4.0PlanIndex, https://planindex.co.uk/; whitespace normalised and classified by HyperscalerWatch; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Other source-reported milestones
Dates and stages are reported by the cited source. A forecast date does not establish that an event happened.
- 23 October 2024 · Application DM/24/02888/RM; source date does not establish commencement. Source
- Planning authority
- County Durham
- Planning reference
- DM/24/02888/RM
- Location accuracy
- Approximate postcode area DH1 5UQ, not a surveyed building footprint. Source address: Plot D Land At Aykley Heads Framwelgate Peth Durham DH1 5UQ
- Record reuse licence
- CC-BY-4.0
- Discovery source ↗
- Primary planning evidence ↗
- Primary planning evidence ↗
- Primary planning evidence ↗
- Related application DM/24/02829/VOC (amendment) ↗
View field-level evidence (13 claims)
- capacityConfidence — corroborated · planning-facts-43274334327b8bd59749381c
- city — corroborated · onspd-1832e5bcc19837b20ca2957b
- country — corroborated · onspd-1832e5bcc19837b20ca2957b
- description — corroborated · planning-facts-43274334327b8bd59749381c
- lastVerifiedAt — corroborated · planning-facts-43274334327b8bd59749381c
- latitude — corroborated · onspd-1832e5bcc19837b20ca2957b
- locationPrecision — corroborated · onspd-1832e5bcc19837b20ca2957b
- longitude — corroborated · onspd-1832e5bcc19837b20ca2957b
- name — corroborated · planning-facts-43274334327b8bd59749381c
- region — corroborated · onspd-1832e5bcc19837b20ca2957b
- status — corroborated · planning-facts-43274334327b8bd59749381c
- type — corroborated · planning-facts-43274334327b8bd59749381c
- verification — corroborated · planning-facts-43274334327b8bd59749381c
Editorial rules uk-editorial-v2-public-trust-v1 · research version 150. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Water
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Employment
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 1 observations added; 1 replaced or withdrawn · version 150
- 17 November 2026 · 6 observations added; 6 replaced or withdrawn · version 149
- 17 November 2026 · 29 observations added; 29 replaced or withdrawn · version 148
- 17 November 2026 · 2 observations added; 2 replaced or withdrawn · version 147
- 17 November 2026 · 0 observations added; 0 replaced or withdrawn · version 125
- 17 November 2026 · 0 observations added; 0 replaced or withdrawn · version 123
- 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 117
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 114
- 17 November 2026 · 6 observations added; 0 replaced or withdrawn · version 113
- 17 November 2026 · 23 observations added; 0 replaced or withdrawn · version 112
- 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 111
- 17 November 2026 · First research version · version 86
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.
Other places nearby
Approximate locations do not establish shared ownership or infrastructure.