Cambois · North East
Cambois data-centre development
Project overview
The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.[3]
Who is behind it?
The source identifies QTS in the developer role for Cambois data-centre development.[1]
A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.
At a glance
- Current stage
- Planning approved
- Site area
- 102 ha[13]
Reading the evidence
The current picture
What we know
The authority assessment states: Natural England describes the former coal-yard site as 102 hectares.[13]
The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.[3]
What is proposed
The developer forecasts: The council reports a forecast 1,200 construction jobs over several years, distinct from permanent campus operations.[4]
The developer forecasts: The council reports hundreds of prospective long-term jobs operating the centres; it is not an observed headcount.[5]
What remains unclear
Cooling-water consumption is not quantified in the published observations shown here.
The evidence shown here does not establish a current or future operator.
See what has been researched ↓The local picture
What could it mean locally?
What the available evidence says about jobs, resources and the surrounding area.
Keeping track
What’s next?
A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.
Updates follow the evidence. Dates and proposals may change; source dates are retained below.
Documents and detailed evidence
The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.
Read the detailed research 13 observations · 4 original sources
Project information
[3]government project description
The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.
www.gov.uk · Labelled field or opening project descriptionThe Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.
Companies and ownership
[1]developer
The source identifies QTS in the developer role for Cambois data-centre development.
Northumberland County Council · Original project/company role statementSite and buildings
[7]maximum campus floorspace
The council describes a campus totalling up to 540,000 square metres. This is development floorspace, not land area.
Northumberland County Council · Project page / maximum-campus-floorspace[12]former site use
The authority assessment states: Natural England identifies the former Blyth Power Station coal yard, unused since the station closed in 2001.
Natural England · Project page / former-site-use[13]site area
The authority assessment states: Natural England describes the former coal-yard site as 102 hectares.
Natural England · Project page / site-areaWater and cooling
[8]closed loop design
The council says QTS proposes a closed-loop water system. No numerical water consumption is established by that statement.
Northumberland County Council · Project page / closed-loop-designJobs and investment
[2]employment unspecified
The source estimates: The government announcement reports an expectation of 1600 jobs. It does not identify a construction versus permanent-job split in this statement.
www.gov.uk · Labelled field or opening project descriptionexpected to create 1600 jobs
[4]construction jobs forecast
The developer forecasts: The council reports a forecast 1,200 construction jobs over several years, distinct from permanent campus operations.
Northumberland County Council · Project page / construction-jobs-forecast[5]operational jobs forecast
The developer forecasts: The council reports hundreds of prospective long-term jobs operating the centres; it is not an observed headcount.
Northumberland County Council · Project page / operational-jobs-forecastEnvironmental assessments
[10]biodiversity unit shortfall
The authority assessment states: Natural England reports a remaining shortfall of 289 biodiversity units after on-site measures.
Natural England · Project page / biodiversity-unit-shortfall[11]open mosaic habitat
The authority assessment states: The biodiversity shortfall included 152 units of open mosaic habitat, according to Natural England.
Natural England · Project page / open-mosaic-habitatPlanning applications
[6]enabling works approved
The authority assessment states: Northumberland announced approval to prepare the Cambois site in August 2025, distinct from proof that the data halls were operating.
Northumberland County Council · Project page / enabling-works-approved[9]phase one reserved matters
The authority assessment states: The December 2025 committee considered 25/02911/REM for two Phase 1 data-centre buildings pursuant to the original outline permission.
Northumberland County Council · Project page / phase-one-reserved-mattersResearch limits
- No verified numerical water-demand figure has been found in the documents checked.
- A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Northumberland County Council · 22 August 2025
Checked 17 November 2026 · Original rights retained; factual summaries onlywww.gov.uk · 27 August 2024
Checked 17 November 2026 · OGL-3.0Northumberland County Council · 2 December 2025
Checked 17 November 2026 · Original rights retained; factual summaries onlyNatural England · 7 January 2026
Checked 17 November 2026 · Original rights retained; factual summaries onlyGeoNames · Publication date not established
Checked 17 November 2026 · CC-BY-4.0GeoNames, CC BY 4.0. Locality centroid only; source authority cross-checked using Postcodes.io.
Reuse conditions ↗Northumberland County Council · 22 August 2025
Checked 17 November 2026 · factual-extractionIndependently written facts from the cited original; original copyright retained. No permission to redistribute source text or images asserted.
Reuse conditions ↗UK government · Publication date not established
Checked 17 November 2026 · OGL-3.0UK government-authored source, OGL v3.0. Neutral project-existence summary adapted; no image or third-party submission copied.; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.
Reuse conditions ↗Record information, planning references and field-level evidence
Facility classification
Function and company association are distinct from development status. Categories can overlap.
- Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
- Planning authority
- Northumberland
- Government document ID
- GOV-6d9db5c0-ef24-412c-9113-9462ed210bd4
- Location accuracy
- Approximate Cambois locality centroid from GeoNames (2653946), checked against Northumberland; not a facility footprint. Source address: Cambois
- Record reuse licence
- OGL-3.0
View field-level evidence (13 claims)
- capacityConfidence — corroborated · planning-facts-f133431906617a1741254235
- city — corroborated · geonames-locality-4894775c787e989f13630b68
- country — corroborated · geonames-locality-4894775c787e989f13630b68
- description — corroborated · planning-facts-f133431906617a1741254235
- lastVerifiedAt — corroborated · original-1353430d2d6d841f3bde42
- latitude — corroborated · geonames-locality-4894775c787e989f13630b68
- locationPrecision — corroborated · geonames-locality-4894775c787e989f13630b68
- longitude — corroborated · geonames-locality-4894775c787e989f13630b68
- name — corroborated · planning-facts-f133431906617a1741254235
- region — corroborated · geonames-locality-4894775c787e989f13630b68
- status — corroborated · original-1353430d2d6d841f3bde42
- type — corroborated · planning-facts-f133431906617a1741254235
- verification — corroborated · planning-facts-f133431906617a1741254235
Editorial rules uk-editorial-v2-public-trust-v1 · research version 280. The presentation updates from the underlying evidence. Restricted source text remains private.
What has been researched?
A category review is bounded by the sources checked. It is not an exhaustive search.
- Identity
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Site
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Power
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- Water
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Employment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Environment
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
- Community views and consultation
- A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
- History
- Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections
These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 280
- 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 199
- 17 November 2026 · 4 observations added; 0 replaced or withdrawn · version 198
- 17 November 2026 · 5 observations added; 0 replaced or withdrawn · version 197
- 17 November 2026 · 2 observations added; 2 replaced or withdrawn · version 151
- 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 105
- 17 November 2026 · First research version · version 33
Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.
Other places nearby
Approximate locations do not establish shared ownership or infrastructure.