Planning approvedResearch updated 17 November 2026

Project overview

The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.[3]

Who is behind it?

The source identifies QTS in the developer role for Cambois data-centre development.[1]

A future operator or tenant has not been established in the evidence shown here. An applicant or developer is a different role.

At a glance

Current stage
Planning approved
Site area
102 ha[13]

Reading the evidence

The current picture

What we know

The authority assessment states: Natural England describes the former coal-yard site as 102 hectares.[13]

The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.[3]

What is proposed

The developer forecasts: The council reports a forecast 1,200 construction jobs over several years, distinct from permanent campus operations.[4]

The developer forecasts: The council reports hundreds of prospective long-term jobs operating the centres; it is not an observed headcount.[5]

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

The evidence shown here does not establish a current or future operator.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Jobs and investment

The developer forecasts: The council reports a forecast 1,200 construction jobs over several years, distinct from permanent campus operations.[4]

The source estimates: The government announcement reports an expectation of 1600 jobs. It does not identify a construction versus permanent-job split in this statement.[2]

Water and cooling

The council says QTS proposes a closed-loop water system. No numerical water consumption is established by that statement.[8]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

Environmental effects

The authority assessment states: Natural England reports a remaining shortfall of 289 biodiversity units after on-site measures.[10]

The authority assessment states: The biodiversity shortfall included 152 units of open mosaic habitat, according to Natural England.[11]

Keeping track

What’s next?

A confirmed next decision or construction milestone has not yet been established in this profile. Planning permission alone does not mean building work has started.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 13 observations · 4 original sources

Project information

[3]government project description

The dated government announcement records: The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.

historic report · 27 August 2024
Scope: GOV-6d9db5c0-ef24-412c-9113-9462ed210bd4
www.gov.uk · Labelled field or opening project description
The Coal Authority's permitting team have been supporting the development of a new AI data centre being built in Cambois, North East England.

Companies and ownership

Site and buildings

[12]former site use

The authority assessment states: Natural England identifies the former Blyth Power Station coal yard, unused since the station closed in 2001.

authority finding · 7 January 2026
Scope: Cambois data-centre development
Natural England · Project page / former-site-use

[13]site area

The authority assessment states: Natural England describes the former coal-yard site as 102 hectares.

authority finding · 7 January 2026
Scope: Cambois data-centre development
Natural England · Project page / site-area

Water and cooling

Jobs and investment

[2]employment unspecified

The source estimates: The government announcement reports an expectation of 1600 jobs. It does not identify a construction versus permanent-job split in this statement.

reported estimate · 27 August 2024
Scope: GOV-6d9db5c0-ef24-412c-9113-9462ed210bd4
www.gov.uk · Labelled field or opening project description
expected to create 1600 jobs

Environmental assessments

[11]open mosaic habitat

The authority assessment states: The biodiversity shortfall included 152 units of open mosaic habitat, according to Natural England.

authority finding · 7 January 2026
Scope: Cambois data-centre development
Natural England · Project page / open-mosaic-habitat

Planning applications

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Government document GOV-6d9db5c0-ef24-412c-9113-9462ed210bd4

UK government · Publication date not established

Checked 17 November 2026 · OGL-3.0

UK government-authored source, OGL v3.0. Neutral project-existence summary adapted; no image or third-party submission copied.; selected facts and neutral proposal summary adapted by HyperscalerWatch. Unknown operator, capacity and dates remain null.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Proposed data-centre development — A development proposal, separately classified from any known facility function and eventual operator. Source
Planning authority
Northumberland
Location accuracy
Approximate Cambois locality centroid from GeoNames (2653946), checked against Northumberland; not a facility footprint. Source address: Cambois
Record reuse licence
OGL-3.0
View field-level evidence (13 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 280. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Power
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
Water
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Employment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Environment
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Community views and consultation
A bounded search was recorded without a finding. This does not establish that no relevant information or effect exists. Recorded 17 November 2026.
History
Some findings are published. Other questions in this category may still be unresolved. Recorded 17 November 2026.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 280
  2. 17 November 2026 · 1 observations added; 0 replaced or withdrawn · version 199
  3. 17 November 2026 · 4 observations added; 0 replaced or withdrawn · version 198
  4. 17 November 2026 · 5 observations added; 0 replaced or withdrawn · version 197
  5. 17 November 2026 · 2 observations added; 2 replaced or withdrawn · version 151
  6. 17 November 2026 · 2 observations added; 0 replaced or withdrawn · version 105
  7. 17 November 2026 · First research version · version 33

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.

Other places nearby

Approximate locations do not establish shared ownership or infrastructure.

Aykley Heads Plot D data centreCity of Durham · AnnouncedPulsant Newcastle upon Tyne NE-1Newcastle upon Tyne · OperationalPulsant Newcastle upon Tyne NE-2North Shields · Operational