Back to the UK atlas

North Shields · North East

Pulsant Newcastle upon Tyne NE-2

OperationalResearch updated 18 November 2026

Project overview

Pulsant offers colocation at NE-2 and identifies it as part of its operated UK data-centre network.[1]

At a glance

Current stage
Operational
Location
North Shields

Reading the evidence

The current picture

What we know

Pulsant offers colocation at NE-2 and identifies it as part of its operated UK data-centre network.[1]

Pulsant identifies Pulsant Newcastle upon Tyne NE-2 in its operating data-centre network.[2]

What is proposed

No specific forecast or commitment is summarised here. This does not establish that no plans exist.

What remains unclear

Cooling-water consumption is not quantified in the published observations shown here.

Employment figures are not recorded in the published observations shown here.

See what has been researched ↓

The local picture

What could it mean locally?

What the available evidence says about jobs, resources and the surrounding area.

Water and cooling

Pulsant lists N+1 cooling redundancy for NE-2. This does not identify cooling-water consumption.[3]

The published observations shown here do not quantify cooling-water consumption. Research coverage below distinguishes checks made from work still outstanding. Drainage and wastewater figures measure different flows.

A developing picture

This profile contains limited published evidence so far. The research coverage below distinguishes work not yet undertaken, access gaps and bounded searches without a finding. Missing information does not establish the absence of benefits or impacts.

Keeping track

What’s next?

We continue to check for changes to the site and any separate expansion plans. The sources shown here do not establish a confirmed next milestone.

Updates follow the evidence. Dates and proposals may change; source dates are retained below.

Documents and detailed evidence

The original records are here for anyone who wants to look more closely. The explanations above are drawn from these observations.

Read the detailed research 3 observations · 1 original sources

Project information

[1]campus operation

Pulsant offers colocation at NE-2 and identifies it as part of its operated UK data-centre network.

historic report · Observation date not established
Scope: Operator-reported operating service; checked 2026-11-18
Pulsant · Official facility page

[2]operator report

Pulsant identifies Pulsant Newcastle upon Tyne NE-2 in its operating data-centre network.

historic report · Observation date not established
Scope: Pulsant Newcastle upon Tyne NE-2
Pulsant · Official facility page

Water and cooling

Research limits

  • No verified numerical water-demand figure has been found in the documents checked.
  • A future operator or hyperscaler tenant has not been established by the checked sources.
Original documents and source information
Published facility address: Pulsant Newcastle upon Tyne NE-2

Pulsant · Publication date not established

Checked 18 November 2026 · factual-extraction

Factual extraction only: independently worded basic site/operator/status and technical identifiers. Publicly displayed service-contract terms reviewed; no express website mining ban observed. No claim of an open text/image licence; original copyright retained. No images or marketing prose copied.

Reuse conditions ↗
Pulsant Newcastle upon Tyne NE-2 — operator colocation page

Pulsant · Publication date not established

Checked 18 November 2026 · factual-extraction

Factual extraction only: independently worded basic site/operator/status and technical identifiers. Publicly displayed service-contract terms reviewed; no express website mining ban observed. No claim of an open text/image licence; original copyright retained. No images or marketing prose copied.

Reuse conditions ↗
Record information, planning references and field-level evidence

Facility classification

Function and company association are distinct from development status. Categories can overlap.

  • Other colocation — Operator-reported facility function; Distinct operator site code. Do not collapse separate sites just because city-level coordinates coincide. Never label a city centroid as site precision. Source

Recorded company roles

  • Pulsant · operator · corroborated Source

A chip owner or compute user is not automatically a site operator or tenant.

View field-level evidence (16 claims)

Editorial rules uk-editorial-v2-public-trust-v1 · research version 426. The presentation updates from the underlying evidence. Restricted source text remains private.

What has been researched?

A category review is bounded by the sources checked. It is not an exhaustive search.

Identity
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Site
Some findings are published. Other questions in this category may still be unresolved. Recorded 18 November 2026.
Power
No category-specific investigation has been recorded yet.
Water
No category-specific investigation has been recorded yet.
Employment
No category-specific investigation has been recorded yet.
Environment
No category-specific investigation has been recorded yet.
Community views and consultation
No category-specific investigation has been recorded yet.
History
No category-specific investigation has been recorded yet.
Research updates and corrections

These dated versions record changes to the published research, including corrections and withdrawals. A research update does not establish a change at the site. Earlier source statements and private research remain in the internal evidence history.

  1. 18 November 2026 · 3 observations added; 4 replaced or withdrawn · version 426
  2. 18 November 2026 · 0 observations added; 1 replaced or withdrawn · version 389
  3. 18 November 2026 · First research version · version 350

Something incorrect or missing? Prepare a correction or source suggestion. Reports are checked against the evidence; they do not directly change a published claim.

Other places nearby

Approximate locations do not establish shared ownership or infrastructure.

Aykley Heads Plot D data centreCity of Durham · AnnouncedCambois data-centre developmentCambois · Planning approvedPulsant Newcastle upon Tyne NE-1Newcastle upon Tyne · Operational